button offcanva subscribe

Contact Us

Don’t hesitate to let us know how we can help you. We are here to answer any questions you might have or assist you with a project.

Subscribe

Join our mailing list and stay up to date on the latest smart technology news and events.

Newsletter Capture
Email*
First Name*
Last Name*
Company*
Title / Position*
Market*
Receive Newsletter*

Call Today 303-484-8237   |   8204 Park Meadows Dr, Suite A, Lone Tree, CO 80124   |  Voted Best AV Company in Colorado 2016 - 2019

                                         

Return to Commercial Project Gallery

Global Down Case Study






About

The Global Down Syndrome Foundation recently built a new 5 story building in the heart of Cherry Creek. The foundation wanted a state-of-the-art audio video system installed throughout the space. Their needs included public address systems, digital signage, video and teleconferencing, control systems, interactive displays, and huddle stations.

Challenge

We had to build systems that would meet the needs of a large staff that would be uniform and easy to use throughout the building. Logic Integration accomplished this by installing control systems to make the operations much easier. Cable pathways in a 5-story building had to be determined prior to the installation to ensure the systems would be able to operate.

Solution

Logic Integration accomplished this by installing control systems to make the operations much easier. In addition to the control systems, Logic installed interactive touch screens in various areas, camera systems with hidden ceiling microphones, wire free tables, and audio systems throughout the building.

Key Technologies

  • Planar UR9851-ERO 98” touch screen.
  • Sharp PN-C805B 80” touch screen.
  • Crestron DMPS control processors with ipad and touchscreen control.
  • Crestron Saros IC6T ceiling speakers.
  • Shure MXA910 Ceiling Array Microphones.
  • Sony Commercial displays.
  • Biamp Tesira Forte DSP audio processors.
  • Chief LTM1U Mounts.